Planning an EV charger installation in Netivot
Every installation starts with the actual conditions on site. We check the electrical panel, connection capacity, estimated cable length, parking location and charger specifications before selecting the equipment and route.
When the building or family may add another electric vehicle, preparation for a second charging point can be considered during the first installation.
The final specification is determined after checking the site and the charger manufacturer’s requirements. Electrical work must comply with the applicable requirements in Israel.
